Quantcast

Prairie State Wire

Tuesday, November 26, 2024

ILLINOIS DEPARTMENT OF TRANSPORTATION: Construction expected to delay I-55 traffic

Road

Illinois Department of Transportation issued the following announcement on Aug. 23.

The Illinois Department of Transportation is advising travelers that a series construction projects along Interstate 55 through Grundy, Livingston and McLean counties will potentially cause backups and delays, particularly on weekends, for the next several weeks.

The projects involve bridge rehabilitations, pavement repairs and patching, which will require permanent and intermittent lane closures in several locations:

• Resurfacing between mile markers 201 and 205. Traffic currently reduced to one lane in each direction. Recommended alternative route of Illinois 116 in Pontiac, Illinois 23, Old U.S. 66 and County Highway 1 in Odell.

• Resurfacing between mile markers 195 and 201. Recommended alternative route of utilizing Old U.S. 66 from exits at U.S. 24, Illinois 116, Illinois 23 and County Highway 1.

• Bridge repairs at mile markers 221 and 189.

• Intermittent patching repairs between mile markers 209 to 233.

Backups are anticipated during heavier travel periods, especially on Fridays and Sundays.

Motorists can expect delays and should allow extra time for trips through this area. Drivers are urged to pay close attention to changed conditions and signs in the work zones, obey the posted speed limits, refrain from using mobile devices and be alert for workers and equipment.

For IDOT District 3 updates, follow us on Twitter at @IDOTDistrict3 or view area construction details on the traveler information map on GettingAroundIllinois.com.

Original source can be found here.

ORGANIZATIONS IN THIS STORY

!RECEIVE ALERTS

The next time we write about any of these orgs, we’ll email you a link to the story. You may edit your settings or unsubscribe at any time.
Sign-up

DONATE

Help support the Metric Media Foundation's mission to restore community based news.
Donate

MORE NEWS